KERNELSOFT · R&D DUE DILIGENCE

Sample R&D Technical Due Diligence Report

An example of the structure and level of detail used in a technical-company report for an investor or acquirer.

Target profile and objective

Company Alpha is a B2B infrastructure-software vendor with a 60-person R&D organization, multiple platforms and enterprise customers. The objective is to assess execution capability, material deal risks and first post-investment actions.

Evidence and method

Founder and employee interviews; product, market, architecture, roadmap, repository, build, QA and support review; innovation, licensing and technical-IP assessment.

01 · Executive summary

Executive deal summary

Proceed subject to an agreed remediation plan covering architecture, QA and key-person dependency.
Strength

The team has strong domain knowledge and the product is used by paying enterprise customers.

Material risk

The architecture scales vertically; the growth plan requires hot-path separation and removal of shared synchronization.

Potential deal blocker

One engineer owns a critical subsystem; documentation and succession coverage are absent.

Evidence gap

Reported stability is not supported by reopen-rate and failure-recovery metrics.

Suggested condition: approve a 100-day plan, appoint an architecture owner, introduce measurable release criteria and reduce single-person dependency.

02 · Startup rating

Early-stage startup rating: BBB+ / 3.2 out of 5

Early-stage startup rating chart, BBB plus
RatingRange
AAA4.50–5.00
AA+4.20–4.49
AA4.00–4.19
A+3.70–3.99
A3.50–3.69
BBB+3.20–3.49
BBB3.00–3.19
BB+2.50–2.99
BB2.00–2.49
C1.00–1.99
4.0Team
4.5Market
3.0Innovation
2.5Product
2.0Process

03 · Maturity and risk map

Score, confidence, impact and key observation

AreaScoreConfidenceImpactObservation
Team and leadership3/5HighMaterial riskNo single owner for product delivery.
Architecture3/5MediumManageable riskA scaling limit is likely within 12–18 months.
Delivery and process2/5HighMaterial riskManual steps delay releases.
QA and support2/5HighMaterial riskAutomation misses critical customer paths.
Innovation and IP4/5MediumStrengthStrong ideas exist; protection is not systematic.
Key-person dependency1/5HighDeal blockerOne engineer controls a critical subsystem.

04 · People and accountability

Observation, evidence and recommendation

ObservationEvidenceRecommendation
The R&D leader owns hiring and code quality but not product delivery.Leaders gave inconsistent answers about roadmap ownership and release criteria.Appoint one delivery owner and document a RACI.
A critical subsystem depends on one principal engineer.Only this engineer diagnoses and releases changes; documentation is incomplete.Introduce paired ownership, a runbook and knowledge transfer.
The team is technically strong but misaligned on priorities.Interviews revealed different views of the customer and core product.Connect product and architecture roadmaps.
Key conclusion: a temporary owner of the 100-day plan and measurable accountability changes are required.

05 · Product and architecture

Product, market, architecture and scalability

Product focus

Multiple segments and platforms are supported without validated prioritization.

Customer value

The team gives inconsistent explanations of the primary customer need and differentiation.

Scalability

The hot path relies on shared structures and cross-core synchronization.

Resilience

Recovery is tested manually; component-level RTO/RPO targets are undefined.

Technical debt

Critical libraries are updated inconsistently and some dependencies lack owners.

06 · Delivery, QA and support

Measurable indicators and actions

MetricCurrent stateAction
Release frequencyIrregularDefine cadence and owner
Critical-test automationBelow targetPrioritize by risk
Reopened defectsNo metricTrack causes and trends
Service recoveryNo unified metricDefine by component
Support feedbackNot linked to roadmapMonthly driver review
  • Manual release steps have no formal owner or rollback criterion.
  • QA and engineering use different definitions of done.
  • Support ticket drivers do not become product improvements.
  • Code coverage is not connected to risk or critical scenarios.

07 · Innovation, IP and plan

The 100-day plan

The product contains technical mechanisms not reflected in the portfolio. Assignments, third-party licenses and alignment between patents and current architecture should be verified.

Days 0–30

Assign delivery and architecture owners; close access and documentation gaps; define release metrics.

Days 31–60

Run a scaling prototype; automate critical tests; create technical and IP risk registers.

Days 61–100

Release the first improvement; validate recovery; transfer knowledge to a second owner; approve the IP plan.

Next decision: after deal conditions are accepted, begin a bounded 30-day stage with weekly reporting on owners, risks, the architecture prototype and release metrics.